BGA Engineering Blog - The Move to 99 Bauer Drive

Thursday, February 08, 2007


BGA held an Official Flag Raising Ceremony on Feb, 8th 2007.

Wednesday, February 07, 2007

These are pictures of three of our offices, in order top to bottom are Vito's office, Bruce's Office, and the ETS office.













We are starting to stock up on product to offer ETS customers faster shipping and better customer service.
Be sure to check out ETS at their websites:
www.etsenergy.com
www.electrictransport.net
And check out the ETS blog located here: http://etsenergy.blogspot.com

Update 2/7/2006 Things have slowly been settling down in the past 3 months. Here are some view around the office on a typical day:





Wednesday, November 15, 2006

BGA is planning on moving to 99 Bauer Drive this weekend (Friday November, 17th thru Monday November 20th).

BGA will close its offices at 1 p.m. on Friday to help facilitate the move.

Please bear with us as we make this transition.

After the move our Phone and Fax numbers will remain the same. The only thing that will change is our address:

BGA, LLC.
99 Bauer Drive
Oakland, NJ 07436

If you are visiting our office, here are simple directions:

Take Route 208 to the Colonial Road Exit. Make a left hand turn onto Colonial Road, and follow the road to the end until you reach the Flashing Red light. Make a right hand turn onto Franklin Lakes Drive, and follow the road until you see the lake on your right. Make the first right hand turn after the lake onto Bauer Drive. 99 Bauer Drive is the second building on the left.

To get to Route 208 from Manhattan, take the GW Bridge to Rt 4 West, and merge onto Rt 208 1 mile past the Paramus Mall.

To get to Route 208 from the Upstate NY and the North West NJ take I-287 to Rt 208.

To get to Route 208 from the South and Central NJ, take the turnpike to route 80 West, and then take Rt 17 North. Take the ramp for Route 4 West, and then merge onto Route 208.

The bathrooms are almost complete with the addition of the toilets, sinks and countertops.



The cubicles have arrived and the ceiling tiles are going up.




Friday, November 10, 2006

The Ceiling Grid in the Lobby has been completed.


The tile work in the bathrooms are now complete.

Mens room:

Ladies Room:



Janitors Closet:

Some more photos of the Carpeting being laid.



You can view this blog with My Yahoo by clicking on the following link:

Add this blog to My Yahoo: Add to My Yahoo!

Or you can view this blog with any other RSS news reader by linking to the following newsfeed: http://bgaengineering.blogspot.com/atom.xml

New Carpet was being added on Thrusday:

Tuesday, November 07, 2006


Today the new HVAC units were hoisted on the roof of the building. You could spot the crane from a mile away, as it was sticking well above most of the trees in the area.



I have a video of one of the units being lifted onto the roof here: http://www.youtube.com/watch?v=tsiStAw8IX0

Monday, November 06, 2006

Network and Phone Wiring has started.


The Demo was completed in the ladies bathroom, and new sheet rock is up on the wall.

Tile work is about to start soon.


The first coat of fresh paint has been applied all over the office. Add to that all the new lights in working conditions, and the office is brighter and better looking than ever.



Friday, November 03, 2006





Demo in the Womens bathroom is now 90% complete, with all fixtures removed, as well as most of the existing tiles.

The walls are up in the mens bathroom. Soon we will start adding new tile in both rooms.

Photos of the curb cuts for the new HVAC Roof Top Units.



Temporary skylight:

Update as of Wednesday:

This photo shows the new parabolic light fixture and new air diffuser on the left and the old light fixture on the right. Most of the fixtures are now in place and being connected.

The first coat of paint has been applied in most areas of the building. This shows Vito's office:
In the offices we have Indirect Light Fixtures as shown here. The Parabolic fixtures are locted in the main room and common areas.
Most of the Doors have been installed as well.